City of Exeter – City Project Tracker

Overview

The City of Exeter is committed to transparency, accountability, and keeping the community informed on important initiatives approved by the City Council.

This City Project Tracker provides a centralized location for residents to view major projects, including when they were approved, a brief description, and their current status.

This page is intended to provide general informational updates only and does not replace official City Council agendas, staff reports, or meeting minutes. All formal actions are taken during publicly noticed City Council meetings in accordance with the Brown Act.

How to Use This Page

  • Project Name: Title or general identifier of the project
  • Date of Approval: Date the City Council approved or authorized the project
  • Status: Current phase of the project (e.g., Planning, In Progress, Completed)

This page will be updated periodically as projects progress. This page was last updated on May 6, 2026.

PROJECT TITLE DATE OF APPROVAL STATUS NOTES
Permanent No Parking Sign Installation on Rocky Hill Drive Adjacent to Exeter Unified School District 1/28/2025 Completed Install permanent No Parking signs on Rocky Hill Drive along school frontage per Resolution No. 2025-03.
SCADA System Implementation – Water and Sewer Operations Upgrade 5/27/2025 Under Construction Long term project for  installation of a SCADA system.
Local Roads Safety Plan (LRSP) Funding and Development 6/10/2025 Applied for Grant in 2025
Will re-apply in 2026
Authorized development of Local Roads Safety Plan (LRSP).
Street Pavement Condition Analysis 6/10/2025 Completed Approved pavement analysis contract and funding appropriation.
FY 2025/26 SB 1 Road Repair Project List Update and Reauthorization 6/24/2025 In Design Approved updated FY 2025/26 SB 1 project list.
Downtown ADA Parking 6/24/2025 In Design Approved ADA parking improvements downtown.
Utility Rate Study – Drinking Water, Wastewater, and Solid Waste Fees 6/24/2025 In Progress Utility Rate Study contract issued, study is in progress.
Annual Street Maintenance Program (Winter 2025/2026 and Summer 2026) 12/9/2025 Reviewing Bids Annual street maintenance.
Drinking Water System Improvement Project – SWRCB Funding Agreement Authorization ($1.56M) 12/9/2025 Out to RFQ City-led infrastructure project supported by external grant/loan funding.
Fire Hydrant Replacement Installation 2/10/2026 Under Construction Contract has been signed and is pending scheduling of work.
Municipal Water Well Construction Site Preparation/Tooleville Emergency Intertie Test Well 3/10/2026 CEQA Completed
Project In Progress
Demolition has already been completed.
Streetlight Christmas Decoration Donor Plaques Replacement – Pine Street Downtown Exeter 3/10/2026 In progress Staff is coordinating with and contracting donating parties.
Blossom Estates LLMAD Landscape Improvement Projects 4/14/2026 In Progress Blossom Estates Lighting and Landscape Maintenance Assessment District (LLMAD) ongoing district maintenance and enhancement efforts.
E Street Active Transportation and ADA Improvements Project – Authorization of Measure R Funding and Design Commencement 4/28/2026 In Design $2,000,000 in Measure R funds to be utilized for the E Street Active Transportation and ADA Improvements Project