City of Exeter – City Project Tracker

Overview

The City of Exeter is committed to transparency, accountability, and keeping the community informed on important initiatives approved by the City Council.

This City Project Tracker provides a centralized location for residents to view major projects, including when they were approved, a brief description, and their current status.

This page is intended to provide general informational updates only and does not replace official City Council agendas, staff reports, or meeting minutes. All formal actions are taken during publicly noticed City Council meetings in accordance with the Brown Act.

How to Use This Page

  • Project Name: Title or general identifier of the project
  • Date of Approval: Date the City Council approved or authorized the project
  • Status: Current phase of the project (e.g., Planning, In Progress, Completed)

This page will be updated periodically as projects progress. This page was last updated on July 31, 2026.

PROJECT TITLE DATE OF APPROVAL STATUS NOTES
1 SCADA System Implementation – Water and Sewer Operations Upgrade 5/27/2025 Completed
3 Local Roads Safety Plan (LRSP) Funding and Development 6/10/2025 Application Submitted Authorized development of Local Roads Safety Plan (LRSP).
4 Street Pavement Condition Analysis 6/10/2025 Completed Approved pavement analysis contract and funding appropriation.
5 FY 2025/26 SB 1 Road Repair Project List Update and Reauthorization 6/24/2025 Completed Approved updated FY 2025/26 SB 1 project list.
6 Downtown ADA Parking 6/24/2025 Contract Awarded Approved ADA parking improvements downtown.
7 Utility Rate Study – Drinking Water, Wastewater, and Solid Waste Fees 6/24/2025 In Progress Utility Rate Study contract issued, study is in progress.
9 Drinking Water System Improvement Project – SWRCB Funding Agreement Authorization ($1.56M) 12/9/2025 Preparing RFP City-led infrastructure project supported by external grant/loan funding.
10 Fire Hydrant Replacement Installation 2/10/2026 Completed Contract has been signed and is pending scheduling of work.
11 Municipal Water Well Construction Site Preparation/Tooleville Emergency Intertie Test Well 3/10/2026 CEQA Completed
Project In Progress
Demolition has already been completed.
12 Streetlight Christmas Decoration Donor Plaques Replacement – Pine Street Downtown Exeter 3/10/2026 In Progress Staff is coordinating with and contracting donating parties.
13 Blossom Estates LLMAD Landscape Improvement Projects 4/14/2026 Completed Blossom Estates Lighting and Landscape Maintenance Assessment District (LLMAD) ongoing district maintenance and enhancement efforts.
14 E Street Active Transportation and ADA Improvements Project – Authorization of Measure R Funding and Design Commencement 4/28/2026 In Design $2,000,000 in Measure R funds to be utilized for the E Street Active Transportation and ADA Improvements Project
15 Well 12 Rehabilitation ( North Kaweah) 5/12/2026 Under Construction Rehabilitation of Well 12 including pump and motor replacement.
16 Waste Water Treatment Plant Dewatering Screw Press Replacement 5/12/2026 In Design
17 Active Transportation Program Cycle 8 Grant Application for Kaweah Gateway: Exeter’s Connected Safety corridor Project 6/9/2026 Proposal Submitted Applying for Kaweah pedestrian Safety improvements.
18 Proposition 4 Statewide Parks Grant Application TBD In Progress Application due in October: Currently applying for Dobson Field $8M Remodel & City Park $4M Remodel
19 Downtown Tree Trimming Project 7/28/2026 Contract Awarded Estimated start date is September of 2026
20 Country View & Awbrey Estates LLMAD Tree Trimming 7/28/2026 Contract Awarded
21 Installation of new mechanical bar screen at the Wastewater Treatment Plant 7/28/2026 Contract Awarded
22 Water Meter Modernization Project 7/28/2026 In progress